采用标准节主弦杆焊胎可调措施,保证焊后尺寸。
附加弯矩导致桅杆的后背主弦杆受拉,传统的螺栓连接方法显得薄弱。
The additional bending moment results in the pulling state of rear back rod of the mast and the conventional bolt connection seems to be very weak.
研究表明,无论支弦杆受拉或受压,随主弦杆拉力的增加,节点承载力逐渐降低。
The results show that the bearing capacity decreases gradually with the tension of chord increasing.
端面有间隙、无凸台对接是指在上、下套管之间留有一定间隙,上、下主弦杆端面同时接触对接。
End face with a gap, no boss butt is refers to the upper and lower casing left a certain gap between the upper and lower main chord rod end face at the same time contact.
吊索在吊点处不得有滑移和脱落,个别吊索应连接在被吊装结构的节点上,不得衔接在主弦杆中部和腹杆上。
There shall be no slip and fall off in the sling hanging point, individual sling should be connected in the hoisting structure nodes, no cohesion in the main chord and web members on the middle.
针对塔式起重机标准节主弦杆因材料批次不同焊接后尺寸不同的问题,提出对塔式起重机标准节主弦杆焊胎的改进方法。
To solve the problem of the variety of the main rod's size after welding to adjustable tower crane standard section, because of the difference of the material batch, a novel approach is proposed.
端面有间隙、带凸台对接外形是指在标准节上部主弦杆上焊有定位凸台,定位凸台伸人另一标准节主弦杆内,上、下套管之间留有一定间隙配合定位。
End face with a gap, no boss butt is refers to the upper and lower casing left a certain gap between the upper and lower main chord rod end face at the same time contact.
针对规范主弦杆受拉则不考虑主弦杆轴力变化对节点承载力的影响,进行主弦杆轴力变化对节点承载力影响的非线性有限元分析,并与规范计算值比较。
The effect of the chord tension on the bearing capacity of the spatial penetrated joint were studied by FEA, the local code and the design bearing capacity criteria.
与弦脉比较,紧脉重搏前波波幅及降中波波幅增高明显(P<0.01);而主波宽度不如弦脉增加明显(P<0.01)。
The amplitude of wave before repeat wave and dicrotic wave obviously increased compared with vire pulse(P<0.01), but its width of main wave didn't increase greatly(P<0.01).
与弦脉比较,紧脉重搏前波波幅及降中波波幅增高明显(P<0.01);而主波宽度不如弦脉增加明显(P<0.01)。
The amplitude of wave before repeat wave and dicrotic wave obviously increased compared with vire pulse(P<0.01), but its width of main wave didn't increase greatly(P<0.01).
应用推荐