• 本文研究一种混联水电站水库群中长期优化调度多维动态规划模型求解方法。

    In this paper a resolving method of multivariate dynamic programming model to mid and long term optimum operation for large scale hydropower system is studied.

    youdao

  • 阅读研究大量水库调度领域文献基础上,研究中长期优化调度以及发电调度风险评估问题

    Based on reading and studying large number of literatures about reservoir scheduling, the long-term optimization scheduling problem and the scheduling risk assessment are studied.

    youdao

  • 建立了梯级水电站中长期联合优化调度模型采用逐步优化算法对其进行求解

    A model of mid-long term optimal dispatching of cascade hydropower stations is established and a solution is given using progressive optimality algorithm.

    youdao

  • 黄河上游梯级水电站例,考虑水电站水库已备有的短期或中长期预报方案,建立优化调度模型

    The long-term optimal operation model is established for Baishan Hydropower Plant and the model is solved with POA algorithm.

    youdao

  • 黄河上游梯级水电站例,考虑水电站水库已备有的短期或中长期预报方案,建立优化调度模型

    The long-term optimal operation model is established for Baishan Hydropower Plant and the model is solved with POA algorithm.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定