分析了中国实验快堆事故停堆后余热的排放过程。
This paper analyzes the process of decay heat removal after Chinese Experimental Fast Reactor (CEFR) scram.
结合研究情况,初步给出了中国实验快堆非能动系统可靠性研究方法。
The passive system reliability is demanded to go deep into research. Combining with the current research, reliability of residual heat removal system of passive systems in CEFR is preliminary formed.
中国实验快堆实现满功率稳定运行72小时,标志着已经掌握快堆关键技术。
The China Experimental fast reactor (CEFR) has achieved full power operation over 72 hours, signifying that China has already mastered the core technology associated with fast reactors.
我国快堆基础研究起步于上世纪60年代中期,2011年中国实验快堆成功实现并网发电。
China's fast reactor basic research started in the mid-1960s and successfully realized power generation in 2011.
摘要:中国实验快堆是我国第一座快中子反应堆,面临着实际问题是需要对维修大纲进行不断优化。
Abstract: China Experimental fast reactor is the first fast neutron reactor, facing a problem that It need to continue to optimize the maintenance program.
堆容器冷却系统是中国实验快堆(CEFR)一回路系统中的重要辅助系统之一,用于在各种工况下对反应堆堆容器进行冷却。
Reactor vessel cooling system is one of the important auxiliary systems in the primary system of China experimental fast reactor (CEFR), which can cool the reactor vessel in various conditions.
本课题结合中国实验快堆(CEFR)重要设备,开发基于Web的远程监测诊断系统,并针对钠泵开发了远程故障诊断软件。
In this paper, The Web-based remote monitoring and failure diagnosis system is developed for important equipments of China Experiment Fast Reactor.
中国原子能科学研究院实验快堆工程部总工程师徐说,2012- 2013年,中国将开始利用自主研发的“第四代”技术,建造中国首个大型核电反应堆。
China will start building its first large nuclear-power reactor with home-developed 'fourth generation' technology in 2012-13, a senior engineer involved in developing the system said.
中国原子能科学研究院实验快堆工程部总工程师徐说,2012- 2013年,中国将开始利用自主研发的“第四代”技术,建造中国首个大型核电反应堆。
China will start building its first large nuclear-power reactor with home-developed 'fourth generation' technology in 2012-13, a senior engineer involved in developing the system said.
应用推荐