通过大型的用户池共享资源来降低基础设施成本,提高峰值负荷能力。
Sharing resources among a large pool of users assists in reducing infrastructure costs and peak load capacity.
如果人们在白天充电,那时电路负荷最高,电力公司可能不得不建造高峰期天然气电站。
If people charge during the day, when electric load is highest, power companies may have to build peaking natural gas plants.
算例结果表明,该模型能够适应电力市场初期可中断负荷参与电网高峰期网络受阻约束调度的需要。
The simulation result shows that the model is fit for using IL in peak load congestion restricted dispatch in developing power market.
应用推荐