紫坪铺公路改建工程高边坡地质情况复杂恶劣,采取了钢筋混凝土锚杆框架梁对坡体进行锚固。
Owing to complicated and adverse geological conditions, the frame girder of reinforced concrete anchor bar was applied to reinforce the high slope of rebuilt access road.
采用传统的加载力学方法和卸荷力学方法,利用数值计算对紫坪铺水利工程引水发电隧洞进口高边坡开挖后的应力-应变进行了研究。
For the high slope of intake of diversion tunnel of Zipingpu Irrigation Project, the relationships of stress and strain are calculated by traditional mechanical methods of unloading and loading.
应用推荐