压入式沉桩是以较小的静压力,使桩克服土体的阻力,把预制钢筋混凝土桩沉入预定的标高,从而获得较大的承载力的桩基工程。
The jacked pile, as one of the types of pile foundation engineering, overcomes the resistance of soil and sinks to the preset level by less static pressure while affording a larger bearing capacity.
通过对比,主厂房确定了采用钢筋混凝土预制桩方案。
Through contrast, precast concrete piles foundation is the eventually choiced scheme.
以快速维持荷载法测定单桩静载荷,来检验钢筋混凝土预制方桩的设计计算,是一种简捷和较为可靠的方法。
This article makes an introduction of a simple and reliable method to determine single pile static load by adoption of fast load-keeping method in order to verify calculation of R.
应用推荐