那不是建设,而是一层一层组装预应力梁构件和预制造模块的过程。预制造的时间并没有算在建设工期内。
It is not building, but, assembling the prestressed beams or prefabricated moulds, floor by floor. Fabrication does not come into the time frame.
对预制构件的自身强度以及预制的墙-墙连接、梁-扳连接、梁-柱连接、柱-柱连接做了分析说明。
The analysis methods of the strength of the precast elements and the connections between the precast load bearing walls, precast slabs, precast beams and precast columns are introduced.
应用推荐