However, separate consideration can not fully reflect how incremental launching influences the designation of section, and increases the constructing cost.
这样将设计施工分离考虑,不能充分体现顶推施工对截面-设计的影响,易造成施工成本的增加。
参考来源 - 钢箱梁斜拉桥顶推施工关键问题研究·2,447,543篇论文数据,部分数据来源于NoteExpress
结合工程施工实践,介绍了多点柔性墩连续顶推施工技术。
Based on the practical construction, this article deals with the flexible piers incremental launching technology.
湖南衡山湘江公路大桥主桥斜拉桥和连续梁采用两岸双向顶推施工完成。
The main spans of Hengshan Xiangjiang Bridge in Hunan are cable stayed bridge and continuous beams.
介绍了跨越多条铁路线路及电气化接触网的连续钢箱梁多点自动连续顶推施工技术。
In this article, the author states the multi-points automatic continuous jacking construction technology of a continuous steel box beam over several railway lines and electrified contacting nets.