On the last step of the compostive assessment method, to calculate the failure probability of the top event of the complex fault trees, the Monte Carlo method is introduced.
进行到综合分析方法的最后一个步骤时,经常遇到求解复杂的故障树的顶事件的失效概率的问题,为此本文使用了数字仿真中的蒙特卡罗方法。
参考来源 - 前起落架系统的系统安全性分析方法研究·2,447,543篇论文数据,部分数据来源于NoteExpress
然后,通过对实例的定量计算,得到系统顶事件的可靠性向量。
Thus, the reliability vector of the whole system is given by means of quantitative calculation.
对导致反应堆控制系统故障的事故序列进行了识别,计算了该系统顶事件的概率。
The event sequences leading to the reactor control system failure are identified and the top event probability of this system is calculated.
文中对引起水套炉发生失效的各个因素进行系统分析,建立了以水套炉失效为顶事件的失效故障树。
All factors that may make the waterjacket heater failure was analyzed in the paper, and builds a fault tree with failure of water-jacket heater as top event was set up.