油田开发阶段断层封闭性研究对于剩余油的挖潜具有重要意义。
Study of fault sealing property was of great significance for tapping the potential of the remaining oil at the stage of oilfield development.
为了确保核电厂安全,应按基建程序完成勘测各阶段任务,特别是对断层的鉴定与评价。
In order to ensure safety in nuclear power plant, must according to capital construction procedure, complete one's work of prospecting, especially give and appraisal of paraclase.
研究目的:胶州湾隧道需穿越海底断层破碎带,因工程地质勘察手段的局限性,决定了勘测阶段的地质资料不足。
Research purposes: Jiaozhou Bay Tunnel is needed to cross the seabed fault zone, but a little survey geological data are obtained because of the means limitation of engineering survey.
应用推荐