根据已经确定的施工进度计划安排,拉西瓦大坝将于2008年底具备下闸蓄水条件。
The Laxiwa dam will be in a condition for reservoir impoundment at the end of the year 2008 in accordance with the fixed progress schedule.
同时计算亦表明,对于闸站合建枢纽此类侧向进水流动,底坎、底坡整流效果不大。
The results of the simulation also show that it is not suitable to install bottom sill or bottom slope in the project which have side-inflow forebay for improving the flow pattern.
应用推荐