运输之前,完全升起并折叠碎土辊,固定好运输锁和折叠架锁定销。
Prior to transporting, fully raise and fold the seedbed conditioner. Install the transport locks and wing stop pins.
拔去锁定销,缓慢的打开折叠架时,应当确认没有人在折叠架的下面。
Once the pins are removed, slowly unfold the unit. Make sure no one is under the wings during the unfolding process.
型动作后有自锁装置(锁定销),需要手动拉出复位后开关才能重新使用。
II-type movements, a self-locking devices (lock marketing), the need to manually reset after switching off can be re-used.
应用推荐