小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
根据设计、施工和现场检测资料,分析了株树桥水库钢筋混凝土面板堆石坝严重渗漏的原因。
The causes for the serious leakage of the reinforced concrete face dam of Zhushuqiao Reservoir are analyzed based on the design, construction and field measured data.
本文采用动力非线性有限元法研究了钢筋混凝土面板堆石坝的地震反应,并用滑移面上的静、动应力求得坝坡抗震稳定安全系数时程曲线。
A study on the dynamic response of a rockfill dam with reinforced concrete facing excited by earthquake by means of nonlinear finite element method was presented in this paper.
应用推荐