隔断墙的安装和外墙一样,在托梁间需要的位置钉木钉。
Frame partition walls as you did the outside walls, again installing blocking between joists wherever it's needed.
块状物,斜钉,专有的紧固件在墙梁-柱子连接中被用到,这比公寓建设需要更多的材料和劳动力。
Blocking, toe-nailing, or proprietary fasteners are needed for the girt-to-post connection, which requires more material and labor than flat construction.
T3的现代技术方法表现在屋顶,楼板,柱子和梁以及家具中使用了实木组件(主要由多层胶合木料和钉压的木板)。
T3's modern technological approach USES engineered wood components (chiefly glulam and nail laminated timber) for the roof, floors, columns and beams, and furniture.
应用推荐