最后对重力网平差的质量控制方法进行了讨论。
At last, some quality control methods are discussed for the adjustment of gravity networks.
本文提出了根据线性规划和连续优化的原理设计重力网的方法。
The design method of gravity network on the basis of the principle of the linea - programming and the sequential optimization is given.
上述的测量极大地改善了我国目前重力网的精度和覆盖率,并为研究重力场的变化提供了重要的基础资料。
The above efforts significantly improve the present precision and distribution of Chinese national gravimetry network, and also provide important basic data to the study on gravity field variation.
应用推荐