工作性的状态不能直接从储存库中获得;它应该基于原始的数据来进行计算,所以我们需要找到配置Rational Team Concert方案的方式。
The status of work item cannot be gotten directly from repository; it should be calculated based on the original data, so we need to find other ways of configuring the Rational Team Concert solution.
论文首先介绍二期改造系统设计方案,包括系统的选型、计算机网络的连接和硬件的配置。
Firstly, the thesis finished the design of the second stage of technical improvement scheme, including selection of control system, connection of network and hardware configuration.
该系统的特点是既可以保证顾客对所采用的产品配置方案满意度最大,又便于产品产品和生产周期的计算。
This method can mostly satisfy the customers' requirements and make the calculation of product costing and period easy.
应用推荐