The first reformer's production capacity is 50kt/a,when the auto-thermal reformer is 40kt/a. Therefore,it's not necessary to rebuild the radiation section of the first reformer,there is only need to transform the convertion to meet the pre-heating requirement of main materiel.
因此一段炉辐射段不作改造,仅对流段作相应改造以满足主要介质的预热要求。
参考来源 - 鸿化合成氨转化系统扩能技改为90kt/a合成氨的方案研究·2,447,543篇论文数据,部分数据来源于NoteExpress
做好辐射段炉墙的隔热保温工作可减少裂解炉辐射段热损失。
Using good heat insulation material for the furnace wall of the radiation section can reduce the heat dissipation in the radiation section of the cracking furnace.
因此一段炉辐射段不作改造,仅对流段作相应改造以满足主要介质的预热要求。
Therefore, it's not necessary to rebuild the radiation section of the first reformer, there is only need to transform the convertion to meet the pre-heating requirement of main materiel.
转化炉是烃类蒸汽转化工艺过程的关键设备,而转化炉的辐射段转化管更为关键的核心。
Reformer is the key equipment in the hydrocarbon steam process while radiation reformer tube is the core of the total.
应用推荐