简述超长钻孔桩钢筋笼施工工艺、阐述了钢筋笼短线法施工过程,同时指出了施工中应注意的问题。
The construction technology of reinforcement skeleton for super-long bored piles is briefly introduced and major points of attention during construction are pointed.
结合实际工程,对嵌入卵石层钻孔灌注桩后压浆设计、施工中后压浆方法的选择、注浆量的确定、后压浆桩的承载力计算、后压浆在超长桩中的应用等进行了研究。
Based on actual projects, it carries out research on the choice of post-grouting method, grouting quantity and bearing capacity of bored pile, and the application of post-grouting in super-long pile.
阐述了超长大直径钻孔灌注桩桩端承载力的影响因素,包括施工工艺、深度效应和尺寸效应等。
The bearing capacity of super-long and large-diameter bored pile tip is influenced by the facts including construction process, depth effect, size effect and so on.