The main contents are:1. Aimed at the peculiarity Zhangze reservoir and the multi-reservoir which are series or parallel, combined with the dispatching delay which has been studied, the forecast period and effective forecast period are analyzed and ascertained.2.
基于前人的研究成果,并根据漳泽水库流域的具体情况,提出并定义了预见期、有效预见期概念,主要内容包括:1.针对漳泽水库上游中型水库串并联的水库群的特点,结合已研究过的调度滞时,分析确定了漳泽水库的预见期及有效预见期。
参考来源 - 漳泽水库预报调度防洪能力研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐