看看时间进度表,ASDI非常担心我们用了一半的时间,却仍然在进行详细的设计。
Looking at the schedule, ASDI was very concerned that we were almost halfway through the project yet still performing detailed design.
各方己根据修改后的初步设计的要求就第8.6条(项目进度表和延误后果)规定的标志日期达成一致。
The parties have reached an agreement on the flag date defined in article 8.6 (Project Schedule and consequences of delay). according to the requirements of the revised preliminary design.
要列出进度表,什么时间勘探清楚,什么时间拿出设计,由专人负责包干。
There must be a timetable for prospecting and design, and there must be people in charge of monitoring each undertaking.