IBM有现成的设备、正在运转的工厂和最新的技术。
It had machines ready, factories running, and new technology.
负责冲压线设备的正常运转,维护,疑难问题技术攻关。
Responsible for the press line of operation, maintenance, technical difficult problem troubleshooting.
文章论述了设备安装过程中找王、找平的技术要求,以及试运转时间的确定原则。
The paper discusses technical demands of making the straight and level during installing equipments, and points out the principle of determining test run time.
应用推荐