在电缆管道建成后,许可证持有人须用天然底土修复受影响的蚝涌溪流河床,使其回复原貌。
After cable duct construction, the Permit Holder shall reinstate the affected stream bed of Ho Chung River to its original conditions using natural substratum.
途经:达东路、富东街、翔东路、小蚝湾车辆扣留中心、翔东路、富东街、达东路、顺东路、达东路、东涌市中心巴士总站。
Routing: via Tat Tung Rd, Fu Tung Street, Cheung Tung Rd, access Road at Siu Ho Wan Vehicle detention Pound, Tung Chung Town Centre Bus Terminus.
应用推荐