水利工程专业词汇英语翻译P-2-SCIdict学术... ... 补注期 Period, replenishing 蓄水期 Period, storage 暴雨期 Period, storm ...
基于8个网页-相关网页
Base on data, distortion character of LianHua faced rock-fill dam body has been reappeared by non-linear Denken E-B model FEM analysis; at the same time, parameters in calculation accordant with model are adopted either in constructionstage or in storage period.
本文根据资料所进行的非线性邓肯E-B模型有限元分析,计算分析了莲花面板堆石坝坝体的变形性状;同时在计算中,无论施工期或蓄水期,都采用与模型配套的统一的参数。
参考来源 - 寒冷地区混凝土面板堆石坝的设计与施工·2,447,543篇论文数据,部分数据来源于NoteExpress
随着三峡库区二期蓄水成功,库区的水环境由过去典型的河流水体转变为类似湖泊的水体,流速减缓,自净能力降低。
With success of second-phase water storage project for the Three Gorges Reservoir, water environment of the reservoir area has changed from typical river water to a kind of water body like lake.
而在频繁的干旱期,蓄水池是空的。
三峡三期围堰系统是二、三期工程衔接及确保按期蓄水发电的关键性控制工程。
The third stage rockfill cofferdam is the key link between the second and the third stage work to secure the reservoir filling and power generation on schedule.
应用推荐