最后通过解决非线性混合整数规划,完成系统的优化管理。
Finally, the optimization of system management would be completed through solving nonlinear mixed integer programming.
电力系统机组组合问题是一个典型的大规模混合整数的非线性组合优化问题,很难得到理论上的最优解。
Power system unit commitment, a problem of nonlinear commitment optimization with typical large-scale hybrid integers, is difficult to get an optimal solution in theory.
汽轮机系统和锅炉系统分别构成线性混合0 - 1整数规划问题和非线性规划问题。
The steam turbine system and the boiler system construct respectively an integral linear 0-1 problem and a non-linear problem.
应用推荐