这个最新的系统每15分钟苏醒一次来进行测量操作,此过程平均消耗约5.3纳瓦的能源。
The newest system wakes every 15 minutes to take measurements and consumes an average of 5.3 nanowatts.
对三年前接替其父统管这家公司的约瑟.曼努埃尔.恩特里坎纳尔斯具有吸引力的是,Endesa的发电水坝和其1,800兆瓦功率的涡轮式风力发动机。
The attraction for José Manuel Entrecanales, who succeeded his father at the top of the company three years ago, is Endesa's hydroelectric dams and its 1,800MW of wind turbines.
阿瓦什河:一条发源于埃塞俄比亚东部的河流,流程约805公里(500英里),向东北注入达纳·基勒沙漠。
A river of eastern Ethiopia flowing about 805 km (500 mi) northeast to the Danakil Desert.
应用推荐