看来唯一的出路是减少一些慈善项目和精简我们的机构。
Seems the only way out is to cut some programs and downsize our organization.
图34的左边显示的是一个项目树,右边则是组合流程各层级的精简视图。
Figure 34 shows a project tree on the left and a compact view of the hierarchical levels of the composed process on the right.
在2010年,该项目是重新启动,但是只是精简到作为一个“救生艇”的用途上,只是在国际空间站上发生紧急事件的时候使用。
In 2010, it was resurrected, and downsized to be used as a "lifeboat," in the event of an emergency on the space station.
应用推荐