因此问题就需要决定是否中断,以及何时中断,使得最大完工时间、完工时间总和、加权完工时间总和等尽可能小。
Thus the problem is to make a decision on whether and when to start the breakdown so as to minimize the maximum completion time, the total completion time or the weighted total completion time.
该技术的关键是采用多种定时中断,包括采样完成中断、定时采集中断、通信中断、实时多任务中断技术等。
The key points to this technology are the timer interrupt, A/D interrupt, communication interrupt and real time operation.
应用推荐