黄壁庄等地应力台站有较明显的异常反映,震前对异常进行了追踪分析,并提出了分析预报意见。
Huangbizhuang and other terrestrial stress stations showed clear anomalies, we made a trace analysis of the anomalies and made a prediction before the earthquake.
大壁厚站场管道的焊接是一项技术性很强的工作。
The welding of heavy thickness pipe for pump station pipeline is a very complicated and technical item.
告成煤矿卸载站煤仓自建成以来,仓壁内出现涌水,造成仓内煤体粘结而难以放出。
Since the unload station coal bunker is built in Gaocheng coal Mine, water is obvious in the coal bunker, it is difficult to cave coal which is glued in the coal bunker.
应用推荐