介绍了淮安枢纽立交地涵工程的特点、深井降水的设计及施工过程。
The characteristics of culvert laying project for pivot overpass in Huaian, the design and engineering process were introduced.
通过数值计算、模型试验和现场观测,对通榆河与苏北灌溉总渠立交地涵的泥沙淤积进行了综合分析。
By means of numerical calculation, model test and field investigation the sedimentation of the underground culvert at the main irrigation canal in North -Jiangsu Province was analysed.
应用推荐