迄今为止,凡在清水条件下水轮机安装高程都是以限制空蚀条件的空化数来确定的。
UP to now, the setting height of the turbine in clear water has been determined by the cavitation number which limits the cavitation conditions.
高水头、大流量泄洪洞内高速水流问题主要问题之一是水流空化引起过流表面空蚀。
One of the main problems of spillway tunnel with large discharge and high velocity flow is the cavitation damage.
漩涡空化一直是空化空蚀研究中的一个重要问题。
Vortex cavitation has been an important problem in cavitation researches.
应用推荐