利用GPS水准对模拟大地水准面进行约束,采用“移去——恢复”技术和多面函数法进行拟合内插,得到转换后的大地水准面。
The GPS-levelling is used to add constraints on the simulated geoid, and the "remove-restore" method and the multi-quadric function method are used to interpolation, so as to obtain the refined geoid.
承包商应按工程师可能随时发出的指示,移去工程的任何部分的覆盖物,或在其内或贯穿其中开孔,并应将该部分恢复原状使之完好。
The Contractor shall uncover any part of the Works or make openings in or through the same as the Engineer may from time to time instruct and shall reinstate and make good such part.
应用推荐