悬挂在这两道横梁上的木闩能够自由地移动。
该仪器索赔3,其中第一处理是连接到移动至少在一个自由度方面的第一次横梁。
The apparatus of claim 3, wherein the first handle is connected to move in at least one degree of freedom with respect to the first cross beam.
压板安装后,进行面板的安装,将面板块轻轻地搁在横梁上向左右移动,推入到压板内。
Panel installation starts after pressure plate installation. Rest the panel gently on the transom and make it move right and left and them push it into the pressure plate.
应用推荐