较详细地介绍了神(木北)朔(州)神木北至神池南段增建二线铺架标段的工程概况及总体施工组织方案。
The general project and construction design of North Shenmu - South Shenchi Double-track Railway Project shall be detailed.
在神朔铁道神木至大柳塔段,为了解地下煤窑空洞与隧道情况,布设了6条测线,共计388个测点,进行了地磁总强度观测工作。
From Shenmu to Daliuta section along Shensuo railway, we set up 6 survey lines in order to understand the condition of underground coal pit and tunnel.
应用推荐