电厂调试过程是对电厂设计、设备制造和安装质量的一次全面检查。
The power plant debugging process is to the power plant design, the equipment manufacture and an installment quality overall check.
该方法有助于快速找出可能影响到核电厂调试工期的因素,进而采取有效措施对调试工期进行优化。
This will help the plants to realize the aspects which affect the time limit of commissioning quickly. Then effective measures to optimize the time limit of commissioning can be found.
本文基于可靠性分析方法,参考各电厂调试经验,采用逻辑分析图对优化调试工期的方法进行了分析。
Based on the commissioning lessons in various plants and reliability centralized analysis, the paper analyzes the approaches to optimize the time limit of commissioning with logic diagram.