并在试验和理论计算的基础上,对下甲板结构的设计进行了讨论。
Based on the experiment and the theoretical calculation the design of the lower deck structure is also discussed.
另外,定位成连接到提升钩机构的甲板闩锁组件有助于将甲板结构连接到第二甲板结构。
A deck latch assembly located connected to the uplift hook mechanism additionally facilitates connection of the deck structure to a second deck structure.
在首部甲板上安装首楼甲板。锚机,系泊配件和锚链管、艏桅杆处等的甲板结构需要加强。
Forecastle deck shall be provided on forward deck. Deck structures in way of windlass, mooring fittings, hawser pipes, foremast etc. shall be reinforced.
应用推荐