验收时间:验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
采用该监测系统可实时监测高炉冷却系统的水温差、流量及热负荷,为高炉安全生产提供有力保障。
The system can monitor water temperature difference, flux and heat load of the BF. The operation result has shown that the system establish basis to blast furnace silent running.