暴雨曾延缓了球场的施工进度,并且导致1930年世界杯决赛阶段的前期比赛转到其它球场进行。
Heavy rain delayed the Centenario's construction and early matches in the 1930 FIFA World Cup finals were switched to alternative venues.
这项技术可以让每个洞在现场进行修改,并逐渐成为球场的一部分,而不是按照图纸施工,将其强加于球场。
This technique allows the hole to evolve on site and become part of it rather than being set out from paper drawings and therefore being imposed upon the site.
埃米尔球场目前正在俱乐部当前球场的同一条路上继续施工著。
Emirates Stadium continues to progress down the road from the Club's current home.
应用推荐