历史阿期荆江河床淤积速率的评估。
The evaluation on silting rate of Jing River bed in historical times.
利用高含沙洪水淤地、治沙,是减少黄河河床淤积、治理沙漠、开发农田十分有效的途径。
It is a very valid approach to use the flood with high sand controlling sand and silting land for reducing the Yellow River bed silted and controlling desert and developing farmland.
在临江至楚山的中段,河床有大量冲积土淤积,冬季水浅,有的地方甚至连顺流而下的木筏也无法通过。
Chosan to Linjiang in the middle, a large number of riverbed silt alluvial soil, winter shallow in some areas, and even down under the raft can not be passed.
应用推荐