本文通过分析,并采取纠偏及加固措施,使沉渣池恢复正常的使用。
In this article, the author analyze reasons and take some rectify and strengthening measures to resume the normal use of the ash pond.
某发电厂沉渣池由于设计时没有考虑抗浮措施,施工完成后,池体在地下水浮力的作用下上浮倾斜,严重影响池的正常使用。
Because of no measures to resist floating in design, a power plant ash pond floated and inclined with the groundwater flotage after construction, which have influenced the normal use of the ash pond.