利用黄河口实测水文及潮汐资料分析计算了海向来沙情况。
The paper analyzes and calculates the sediment coming from the sea by utilizing the observed hydrological and tidal data of the Yellow River estuary.
然后根据水文及水质资料分析并确定模型参数。
The model parameters are analyzed and identified by hydrology and water quality data.
在对大河金矿水文地质资料综合分析和实地调查的基础上,选定了一套适用于大河金矿堵水的总体方案,并作出详细的设计。
On the basis of synthetic analysis of hydrogeological informations and in situ investigation, an overall programme of blocking water suitable for Dahe Gold Mine is worked out and designed.
应用推荐