...nsu Province(甘肃省黑河干流细土平原区灌溉水入渗运移的初步研究)[J].Hydrogeology and Engineering Geology(水文地质工程地质),2002,30(4):1-4.
基于74个网页-相关网页
这种方法原理新颖,经济、快速,为水文地质和工程地质工作量化提供了新手段。
The method has a new principle, good economy and quickness and provides a new means for quantifying of hydrogeological investigations and engineering geology.
不属于工程量清单范围内的变化,提供的工程地质资料、水文地质资料与实际不符而增加的工程量。
Change is outside the list of engineering quantity; supplied engineering geology datum and hydro-geological data don't agree with practical condition.
广西地质测井中心利用综合物探方法对场地的水文地质、工程地质和环境地质进行勘察评价。
Guangxi geology well logging centre used comprehensive geophysical prospecting method to survey and evaluate the conditions of hydrogeology, engineering geology and environmental geology.
应用推荐