推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
武山铜矿南矿带采用上向水平分层进路水砂充填法回采,采场多次发生冒顶、片帮。
The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.
应用推荐