水中施工还应考虑流水侧压力。
In the water constructs also should consider the running water lateral pressure.
夹江大桥主墩的水中大型承台是施工的难点之一。
Large bearing platform above the water is one of difficult points in the construction of Jiajiang bridge.
介绍了泰安抽水蓄能电站上水库库盆采用的土工膜水平防渗措施及其施工缺陷处理,并对水库初期蓄水中的渗漏情况进行了简要的分析。
This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.
应用推荐