在下一阶段,将继续建成一个年产20万吨的球磨铸管厂和年产250万吨的钢厂。
In next phases, a ductile iron pipes factory with the production capacity of 2 hundred-thousand tons and a steel factory with the production capacity of 2.5 million tones per annum will be added.
本文用一段录像显示一个带有一定锥度的薄板坯连铸结晶器内的钢液流动在使用了电磁制动后是如何受到影响并逐渐减弱的。
A video will be presented showing how steel flow in a thin slab caster with a tapered mold is influenced and calmed down when using the EMBR.
根据板坯连铸扇形段吊装更换的生产操作要求,叙述了如何布置和设计扇形段更换吊具和导轨以及需要注意的事项。
This paper puts forward the arrangement and the design of slab CCM segment suspension system, the guide rail and the attentions according to the production requirements.
应用推荐