悬栅消力池是在新疆喀什河吉林台一级水电站引水隧洞水力学模型试验中提出的一种新型消能工型式。
A new form of energy dissipater named suspended grid plunge pool is posed through the hydraulic model experiment of diversion tunnel in Jilintai first-or.
对崆峒水库输水洞平板闸门改建为锥形阀后的消力池进行了模型试验研究。
After the Kongdong reservoir water hole plate gate rebuild into a cone valve, the stilling basin, model test was conducted.
通过对在室内冰池进行的平台冰力模型试验中相似律、模型比尺选择、模拟冰条件以及冰力测量系统论述,证明了该项试验是可靠的和严密的。
The test is testified to be reliable and accurate by the description of scaling law of indoor ice pool platform model test, model scale choice, simulated ice conditions, and ice force measure system.
应用推荐