江津观音岩长江大桥为结合梁桥,为防止桥面板湿接缝在约束条件下产生裂缝,该桥面板湿接缝要求采用微膨胀混凝土,以补偿混凝土的收缩、徐变。
In order to prevent the cracks that would be likely caused by restricted conditions of the wet-joint, the wet-joint demands using expansive concrete to compensate the shrinkage and creep.
在建的武汉二七长江大桥是主梁采用钢结构,桥面板为混凝土结构,主梁与桥面板用剪力件连接的世界上最大跨度的三塔结合梁斜拉桥。
Erqi Yangtze River bridge is composite girder cable-stayed bridge with three towers with the longest span in the world, which is connected with steel girder and concrete slab.
芜湖长江大桥桥塔拉索锚固区为预应力混凝土箱形结构,无中间梁,索塔锚固区为单箱单室结构。
The cable anchoring zone on the cable tower of the Wuhu Yangtze River bridge is of pre stressed reinforced concrete box structure without intermediate beam.
应用推荐