我国港口建设迅猛发展,近年来建设了一些大型高桩墩台结构的液化石油气码头、油码头。
With the recent development rapid in port construction in China, some large size abutment pier with high level piles were built, including liquefied petroleum gas berths and oil berths.
按此设计而成的某桥梁,建成后对桥梁桩墩及桥坡沉降进行了长期监测,结果表明最初的设计意图得以实现。
The bridge's settlement is monitored for nearly two years after construction, and the results indicate that the primary design intent has been realized.
针对群桩墩处河床局部冲刷的复杂性,运用正态动床物理模型较好地预测了桥墩附近河床局部冲刷,并获得了现场监测结果的验证。
According to the local scouring around the pile foundation of the pylon, a normal movable-bed physical model test is conducted to predict the local scouring and is verified by the field measured data.
应用推荐