结果表明在标准载荷下,该装置应力分布情况良好。 同时该装置结构设计合理,承载力大。
The results indicate that under standard load, the installation has good stress distribution, and good bearing capacity because of rational structural design.
设计工程师负责对分析结果进行评审。按照标准载荷组载荷要求,对载荷进行调整的相关事宜,由管架集团工程总监作出最终决定。
Review of the results will be performed by a Design engineer and decisions regarding modification to standard load group loadings will be determined by the PSG Engineering Director.
在分析已有单桩静载荷试验资料及单桩竖向抗压极限承载力确定标准的基础上,本文提出了确定单桩承载力的一种建议方法。
A proposed method to determine the ultimate bearing capacity of pile is presented based on analyzing the data of loading tests and the related criterions for single pile.
应用推荐