如何利用现场抗拔静载试验中未达到破坏的工程试桩数据来确定其抗拔极限承载力是一个重要的工程问题。
It is very important for engineer to determine the uplift ultimate bearing capacity by using the data of non-destructive test of pile.
研究了极限上拔承载力和抗拔桩的破坏机理。
The ultimate uplift bearing capacity, failure mechanism of piles were studied.
坑底以下有效桩长相同时,开挖深度越大,开挖后桩周土体超固结比越大,抗拔桩极限承载力也越大。
When the length of the pile under the bottom of the pit is the same, the deeper the excavation is, the larger the ultimate uplift capacity of pile is.