介绍了本钢冷轧薄板公司横剪机组板垛设备存在的问题,改造方法和改造后的使用效果。
Existing problem with sheet packing device in the two shearing lines in Benxi Iron and Steel Company, its modification measures and the result after modernization.
气垫垛板是横剪的最后一道工序,只有选择合适的风压才能满足垛板的工艺要求。
Air cushion pillar is the last process of crosscut. Only to select an appropriate air pressure meets the technical demand.
简要介绍冷轧机横切机组尾部气垫垛板的设计计算。
The article describes the design and calculation of air-cushion piler at the rear end of the cross-cut shear in cold rolling mills.
应用推荐